Regulation on the detailed scope and form of the construction project (2012 amended in 2015)

Last updated: 14 September 2020
Regulation concerning the detailed scope and form of construction from 2012 amended in 2015. This regulation among other specifies requirements detailed scope and form of construction. It orders to attach as part of the construction project, the energy performance of the building. It also orders to analyse the possibility (if its technically and economically viable) of using high-efficiency alternative systems of energy and heat supply, which include decentralized energy supply systems based on renewable energy, cogeneration, heating or cooling district or block, in specifically, if it is based entirely or partially on energy from renewable sources. This analysis should contain: The annual demand for usable energy for heating, ventilation, domestic hot water and cooling calculated in accordance with the rules on the methodology for calculating the energy performance of buildings; The available energy sources; Conditions for connection to external networks; A choice of two power supply systems for benchmarking: - The conventional system and the system of alternative or - The conventional system and hybrid system, understood as a combination of conventional and alternative system; Comparative calculations for selected energy supply systems; The results of the comparative analysis and the choice of energy supply system. Applicable Building Type(s) New residential, New non-residential Policy Requirement Level Mandatory Governance Development Authority: Minister of Transport, Construction and Maritime Economy Implementation Authority: Minister of Transport, Construction and Maritime Economy Enforcement Authority: designer / the appropriate authority building control Prescriptive Compliance path End-uses considered: Water heating, Space heating, Space cooling, Lighting interior Resources Notes Climate zones

Want to know more about this policy ? Learn more