Integrated plan for the promotion of electric vehicles
This plan includes the Integrated Strategy for Electric Vehicles promotion 2010–2014 and its Action Plans (2010–2012 and 2012–2014). The Integrated Strategy setsthe goal of putting 250,000 electric vehicles (BEVs and PHEVs) on Spain’s roads,which could be recharged at 343,510 charging points throughout Spain. The planenvisions the rollout of the plug-in electric vehicles occurring according to the timetableset forth in Figure 25.2.
Want to know more about this policy ? Learn more