Wind Power Programme

Source: JOIN IEA/IRENA Policy and Measures Database
Last updated: 10 July 2012
This programme aimed to construct 100 MW of wind power capacity in Finland before 2005. This programmed finished in 2005, as planned. At that time, wind power capacity in Finland was 82 MW. Therefore, the goal of 100 MW was not completely achieved. As of September 2007, wind power capacity in Finland was 86 MW, and the milestone of 100 MW is expected to be reached in the next few years.