Modelled annual operational cost savings for the TECO power system in Florida, as a percentage of total system operational costs without solar PV generation

Last updated 1 Oct 2019

Related charts

Operating and planned CO2 storage facilities by storage type as of 2023

Open

Status of CO2 storage infrastructure in development vs. planned capture capacity by region, 2023

Open

Annual CO2 storage capacity, current and planned vs Net Zero Scenario, 2020-2030

Open

Annual CO2 capture capacity vs CO2 storage capacity, current and planned, 2022-2030

Open