Mandatory EV charging infrastructure in buildings
Non-residential buildings over 500m2 or residential building with more than 10 abitative units starting from the first of January 2018 can receive a building permit only if the project contemplate charging infrastructures for EV. This applies also to buildings undergoing deep renovation.
For non-residential buildings each indoor or outdoor parking slot and/or box need to be provided with charging infrastructure. For Residential builsings at least 20% of the parking units and/or box need to be equipped with such infrastructure.
The legislative decree 16/12/2016 transpose the European directive 2014/94/EU of the 22nd of October 2014.
Want to know more about this policy ? Learn more (Italian)