Electrical Easement Act (N° 29,701)
The Act modifies the process to request for an electrical easement, facilitating the process in order to solve some bottlenecks and problems detected in the former process. Consequently, the time needed to get an easement to build a high voltage transmission power line will be lower, diminishing the length of these projects, allowing a more efficient supply of electricity. Additionally, renewables energy will benefit, considering these projects are built in shorter time and are more influenced by the lack of an adequate transmission infraestructure.